Your Street Will Be Closing For Scheduled Maintenance
TUESDAY 5/6 IS RAINED OUT
Updates will be posted on rainouts once reschedule dates are approved and maps have been prepared.
See The Map Below For Details On The Closures
WHY ARE MY ROADS CLOSING?
Holbrook Asphalt will be performing street maintenance in your area on behalf of the City of San Marcos. The product being applied is a High Density Mineral Bond called HA5. The treatment will help significantly extend the life of the streets. The benefits of properly maintained streets include higher property values, a smoother/safer ride, and reduced costs to the community by prolonging the need for replacement.
**Click Images to Enlarge**


WEATHER UPDATES




This project is scheduled to take place from May 5-May 24, weather permitting. Use the map above to see which days work will be performed on your streets.
PARKING OFF STREETS
Please do not park within 50 feet of any street being worked on. A tow truck will be called for any cars parked on the streets scheduled to be treated that day.
WHAT IF I DRIVE ON THE ROAD WHILE CLOSED?
Road closure barricades will be placed at each end of the closed street. If you drive on any closed streets, you may be held liable for damage to your vehicle and to repair the area of the road you have driven on. In the event of a life-threatening emergency, emergency vehicles will not be stopped from driving on the treated surface.
ALL OUTSIDE WATER MUST BE TURNED OFF
Water may damage the installation of the surface treatment. Please do not have sprinklers, hoses, etc set to come on 24 hours before the road closure, during the road closure, or 24 hours after the road closure.
WEATHER CANCELLATION PROCEDURES:
If your street is canceled due to weather, THAT DAY will be rescheduled. All other days will proceed as scheduled. You will receive notification of your new closure date prior to the newly rescheduled date. You will not receive a cancellation notice (if we have removed the barricades, you can bring your cars back in), and you will not receive immediate notice of your new date. If you require earlier notification of your rescheduled closure date, please call the number, and we will be happy to let you know of any approved dates.
FREQUENTLY ASKED QUESTIONS:
Q: What will we do on trash day?
A: If your street is scheduled for closure on your trash day, please put your can out the night prior so that it can be picked up prior to 7am.
Q: How will this affect emergency vehicles?
A: In the event of a life-threatening emergency, emergency vehicles will not be stopped from driving on the treated surface.
Q: How will we get our mail?
A: A copy of the maps has been sent to your local post office. Please contact your Post Office to inquire about their specific plans for delivery.
Q: How do I get my UPS/FEDEX packages?
A: Please reschedule deliveries from UPS/FEDEX/AMAZON etc.