City of Owasso Pavement Preservation

Your Street Will Be Closing For Scheduled Maintenance

See The Map Below For Details On The Closures

WHY ARE MY ROADS CLOSING?

Holbrook Asphalt will be performing street maintenance in your area on behalf of the City of Owasso. The product being applied is a High Density Mineral Bond called HA5. The treatment will help significantly extend the life of the streets. The benefits of properly maintained streets include higher property values, a smoother/safer ride, and reduced costs to the community by prolonging the need for replacement.

This project is scheduled to take place from June 24 to July 2, weather permitting. Use the map above to see which days work will be performed on your streets.

WHAT IF MY CAR IS PARKED ON A ROAD THAT IS CLOSED?

Work will commence from 7:00 AM to 7:00 PM. A tow truck will be called for any cars parked on the streets scheduled to be treated that day. Please do not park within 50 feet of any street being worked on. Towing expenses will be the owner’s responsibility.

WHAT IF I DRIVE ON THE ROAD WHILE CLOSED?

You will be liable for damage to your vehicle and to repair the area of the road you have driven on. The minimum repair cost is $750 to repair the installed surface treatment. In the event of a life-threatening emergency, emergency vehicles will not be stopped from driving on the treated surface.

ALL OUTSIDE WATER MUST BE TURNED OFF

Water may damage the installation of the surface treatment. Please do not have sprinklers, hoses, etc. set to come on 24 hours before the road closure, during the road closure, or 24 hours after the road closure. Damage due to outdoor water use will result in the same minimum repair cost of $750 to repair the installed surface treatment.

SHUTTLE SERVICE

A shuttle service is being provided for your convenience from 7am until 7pm while the streets are being treated. The shuttle will take you to/from your car. The shuttle service driver’s ability to recognize the curing stage of the newly installed surface treatment and lighter weight vehicle makes this service possible. To reach the shuttle please 808-271-0303. PLEASE ALLOW AT LEAST 30 MINUTE NOTICE FOR SHUTTLE SERVICE .  SHUTTLE DISCLAIMER: There are times when the entire roadway is simply not available for any travel whatsoever and the golf cart will not be able to perform the service until the proper amount of curing has taken place. We appreciate your cooperation as we work to improve your roadways.

WEATHER CANCELLATION PROCEDURES:

If your street is canceled due to weather, THAT DAY will be rescheduled. All other days will proceed as scheduled. You will receive notification of your new closure date prior to the newly rescheduled date. You will not receive a cancellation notice (if we have removed the barricades, you can bring your cars back in), and you will not receive immediate notice of your new date. If you require earlier notification of your rescheduled closure date, please call the number, and we will be happy to let you know of any approved dates.

FREQUENTLY ASKED QUESTIONS:

Q: What will we do on trash day?

A: We have spoken with the trash service, and your trash will be picked up as scheduled

Q: How will this affect emergency vehicles?

A: In the event of a life-threatening emergency, emergency vehicles will not be stopped from driving on the treated surface.

Q: How will we get our mail/FEDEX/UPS Packages?

A: We have spoken with the delivery services, and you will get your mail as scheduled.

PROJECT CONTACTS:

HOLBROOK OFFICE @ 405-953-7977

Beau Rilley @ 808-271-0303