City of Rocklin California HA5 Pavement Preservation Project

We will be resurfacing your roads with HA5 High Density Mineral Bond this season. This resurfacing product is designed to extend the life of asphalt concrete in your neighborhood. Asphalt streets that maintain pavement flexibility experience less cracking and a longer useful life.

In order to help the process go smoothly we wanted to give you a little information on what to expect. During this process we will need to close your road overnight to give the product sufficient time to cure.

Here are the maps for your community:

** See map for your street’s specific day of closure **

City of Rocklin residents:

The areas highlighted in RED will be CLOSED on Monday June 1st
The areas highlighted in BLUE will be CLOSED on Tuesday June 2nd
The areas highlighted in YELLOW will be CLOSED on Wednesday June 3rd
AND
The areas highlighted in AQUA will be CLOSED on Thursday June 4th
for asphalt resurfacing. Please plan accordingly.  

Note: Unforseen events may cause schedules to change and maps may be updated. The notification(s) you get on your door will be the most up-to-date. Always defer to those hand delivered notifications.

Frequently Asked Questions

WHY IS MY ROAD CLOSING?

Roads in your subdivision are having a pavement preservation treatment installed that will help significantly extend the life of asphalt streets. The benefits of properly maintained streets include higher property values, a smoother/safer ride, and reduced costs to the community by prolonging the need for replacement.

WHAT IF MY CAR IS PARKED ON A ROAD THAT IS CLOSED?

Work will commence at 7:00 AM and the streets being treated will be closed for 24 hours. A tow truck will be called for any cars parked on the streets scheduled to be treated that day. Please do not park within 50 feet of any street being worked on.  Towing expenses will be the owner’s responsibility.

WHAT IF I DRIVE ON THE ROAD WHILE CLOSED?

You will be liable for damage to your vehicle and to repair the area of road you have driven on. Minimum repair cost is $600, maximum $3,000, to repair the installed surface treatment. In the event of a life-threatening emergency, emergency vehicles will not be stopped from driving on the treated surface.

ALL OUTSIDE WATER MUST BE TURNED OFF

Water may damage the installation of the surface treatment. Please do not have sprinklers, hoses, etc… set to come on 24 hours before the road closure, during the road closure, or 24 hours after the road closure. Damage due to outdoor water use will result in the same repair cost of $600 minimum, $3,000 maximum, to repair the installed surface treatment.

IF WEATHER CAUSES A HALT TO THE PROJECT, YOUR STREET MAY BE REQUIRED TO BE CLOSED ANOTHER DAY. IF THIS HAPPENS, YOU WILL RECEIVE ANOTHER NOTIFICATION ONCE A DATE HAS BEEN APPROVED FOR THE RESCHEDULE.

HOW WILL WE GET OUR MAIL, FEDEX AND UPS PACKAGES?

You will need to contact the office that delivers your mail to find out if they plan to walk your mail in to you or not. FedEx and UPS (and others of this kind) will have to walk deliveries in to residents. The complex nature of these services hinders our ability to notify them of the closures.

HOW WILL THIS AFFECT ANY LANDSCAPING WORK?

Please hold off on any landscape work while road work is being performed and turn off sprinkler systems during and 24 hours after the road is treated.

HOW WILL THIS AFFECT EMERGENCY VEHICLES?

Emergency vehicles will be able to access any home in the neighborhood 24 hours a day.

HOW DO I KNOW WHEN MY ROAD WILL BE CLOSED?

You can see your street closure date(s) above, and we will notify you in advance of your street closure with a paper notice that will be delivered to your garage door OR front door.

Tips to Help You Through The Process

Please pay particular attention to the construction vehicles and workers on your streets. Project Streets will be completely closed.  Review the closures on your map so that you can design alternate routes during the project.

We ask that you SHUT OFF ALL OUTSIDE WATER Two (2) Days prior to the scheduled date, including garden hoses & SPRINKLERS.  If any sprinklers are on during this time, the Home Owner will be responsible for any additional costs. 

If the weather is such that there is a chance of rain, or there is too much moisture as a result of previous rain, we will not apply the material and will have to reschedule the application.

We understand that this is an inconvenience for most of you.  We apologize for this inconvenience and we thank you for your cooperation as we work to improve your roadways.  Please feel free to call us if you have any questions. See the paper notice or the specific web page dedicated to your community’s project.

Project Contacts

OFFICE @ 435-652-4427
Cody Seng @ 435-705-6156